CTDUT BOARD

18/04/2012:
Recently, PRCI has executed two separate Memoranda of...
09/03/2012:
The Pipeline Technology Center (Centro de Tecnologia em...
18/11/2010:
One of the great difficulties of the pipeline sector is the...
17/11/2010:
The technologic challenges the pipeline sector, for the oil...
18/11/2010:
There are no Biddings at this time.

Testing Facilities



The CTDUT has real scale installations and research laboratories for testing products and services used in the pipeline network. An infrastructure that offers – considering the high risk and cost of conducting tests on active pipelines – technical and economic advantages for suppliers and operators.

Our installations include a 14” Test Pipeline, 20” Riser and a Structural Integrity Laboratory. The latter, capable of conducting pipe pressure and equipment tests up to the rupture limit, in total safety.

We begin the construction of a test oil pipeline, 2500 meters long and the Cathodic Protection Pilot Unit.

Access the videos of some tests in CTDUT:

Test Samarco Mining - Structural Integrity Laboratory

Demonstration A-Hak Week CTDUT - LOOP 14